Hydrotech 5600 SXT User Programming Chart Bedienungsanleitung Seite 7

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 10
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 6
Model 5600 SXT- Master Programming Chart
FROM SERVICE MODE:-
To enter master programming mode, set the Time of Day display to 12:01 P.M.
Press and hold and buttons together until the programming icon
replaces the service icon
Display is DF (DISPLAY FORMAT)
Unit of measure for volume and display format for
time [Factory Default Setting: GAL]. Press UP/DOWN buttons to adjust the settings.
Display is VT (VALVE TYPE)
type of valve setting [Factory Setting: Fltr (Filter)]. Press
UP/DOWN buttons to adjust the settings.
Display is CT (Control Type)
type of regeneration [Factory Setting: Fd (Meter Delayed)].
Press UP/DOWN buttons to adjust the settings.
Display is NT (Number of Tanks)
[Factory Default Setting: 1]. Do not change the setting.
Display is UNIT CAPACITY
Capacity in gallons. [Factory Default Setting: 10000 gallons]
].
Press UP/DOWN buttons to adjust the value.
Extra Cycle
Button
Extra Cycle
Button
Extra Cycle
Button
Extra Cycle
Button
Extra Cycle
Button
Extra Cycle
Button
UP DOWN
Seitenansicht 6
1 2 3 4 5 6 7 8 9 10

Kommentare zu diesen Handbüchern

Keine Kommentare

MUKii HDD/SSD enclosures user manuals

Starting on T

Click on an alphabet below to scroll to the full list of models starting with that letter

Models Document Type
TIP-230U2-BK
Specifications    MUKii TIP-230SU-BK storage enclosure, 24 pages